publicacio - No-wait flowshop with separate setup times to minimize maximum lateness

No-wait flowshop with separate setup times to minimize maximum lateness

Area d'investigacio: Articulos Any: 2007
Tipus de publicacio: Articul
Autors: Ruiz, Rubén; Allahverdi, A.
Revista: International Journal of Advanced Manufacturing Technology Volum: 35
Número: 5-6 Pagines: 551-565
Nota:
Times Cited: 2 Article English Ruiz, R Univ Politecn Valencia, Dept Operat Res {&} Appl Stat, Camino Vera S-N, E-46071 Valencia, Spain Cited References Count: 27 229WF SPRINGER LONDON LTD ASHBOURNE HOUSE, THE GUILDWAY, OLD PORTSMOUTH ROAD, ARTINGTON GU3 1LP, GUILDFORD, ENGLAND ARTINGTON
Abstract:
This paper considers the m-machine no-wait flowshop problem with the objective of minimizing the maximum lateness where setup times are considered as separate from processing times and treated as sequence-independent. A dominance relation is developed for the case of three machines and several heuristics and four new effective and efficient genetic algorithms are proposed. The genetic algorithms make use of advanced concepts like steady-state and elitist generational scheme as well as new fast-selection operators. Extensive experimentation is conducted to evaluate the performance of the dominance rule, the proposed heuristics, and the genetic algorithms. The computational and statistical analyses by means of experimental designs show that the genetic algorithms provide better results than the existing literature under the same conditions. Additionally, the proposed dominance rule shows great potential for instances where the processing and setup times are tightly distributed
Versio digital
[ Enrere ]